About

Working Groups

NoWorking Groups
1-TRENCHLESS CONSTRUCTION METHODS
a-Horizontal Directional Drilling (HDD) Group
b-Microtunneling (Pipe Jacking) Group
2-TRENCHLESS RENEWAL AND REINFORCEMENT METHODS
a-Cured-in-place Pipe (CIPP) Group
b-Fiber Reinforced Polymer (FRP) Applications Group
3-MONITORING AND CONDITION ASSESMENT METHODS IN INFRASTRUCTURE PIPELINES
4-PLANNING AND ASSET MANAGEMENT IN INFRASTRUCTURE PIPELINES
5-QUALITY, STANDARDIZATION AND OCCUPATIONAL SAFETY IN INFRASTRUCTURE CONSTRUCTION
6-EARTHQUAKE RISK IN INFRASTRUCTURE PIPELINES
7-WATER LOSS CONTROL